{"id":1831,"date":"2025-08-08T06:28:39","date_gmt":"2025-08-08T06:28:39","guid":{"rendered":"https:\/\/desjoyauxgh.com\/?p=1831"},"modified":"2025-08-08T06:28:39","modified_gmt":"2025-08-08T06:28:39","slug":"top-guide-how-to-choose-a-swimming-pool-contractor-in-ghana","status":"publish","type":"post","link":"https:\/\/desjoyauxgh.com\/index.php\/2025\/08\/08\/top-guide-how-to-choose-a-swimming-pool-contractor-in-ghana\/","title":{"rendered":"Top Guide: How to Choose a Swimming Pool Contractor in Ghana"},"content":{"rendered":"<h1><b>How to Choose Your Swimming Pool Contractor in Accra, Ghana: A Detailed Technical Guide<\/b><\/h1>\n<p><span style=\"font-weight: 400;\">Installing a swimming pool is a major investment in comfort, property value, and lifestyle. In Accra\u2019s tropical climate &#8211; where heavy rains, intense sun, and fluctuating water tables pose unique challenges &#8211; selecting the right contractor is critical to ensuring your pool remains leak\u2011free, efficient, and beautiful for decades. Below, we dive deep into five essential criteria to vet any pool builder, with technical insights and local considerations.<\/span><\/p>\n<h2><b>1. Inspect Filtration Type: Pipeless vs. Traditional<\/b><\/h2>\n<h3><b>Traditional Filtration Systems<\/b><\/h3>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Underground Piping:<\/b><span style=\"font-weight: 400;\"> PVC or high\u2011density polyethylene (HDPE) pipes run from skimmers and returns to an external pump and filter station (plant room).<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Common Filters:<\/b><b>\n<p><\/b><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"2\"><i><span style=\"font-weight: 400;\">Sand Filters<\/span><\/i><span style=\"font-weight: 400;\"> trap debris in a bed of graded sand; backwashing required every 2\u20134 weeks.<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"2\"><i><span style=\"font-weight: 400;\">Cartridge Filters<\/span><\/i><span style=\"font-weight: 400;\"> use replaceable pleated cartridges; cleaning frequency depends on bather load (usually monthly).<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><b>Drawbacks in Ghana:<\/b><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Underground joints are prone to ground movement and root intrusion, leading to hidden leaks.<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Backwash water disposal can burden Accra\u2019s drainage if not managed properly.<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Plant room footprint cuts into usable poolside or roof\u2011deck space.<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<\/ul>\n<h3><b>Pipeless (Monobloc) Filtration by Desjoyaux<\/b><\/h3>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Integrated Vault Unit:<\/b><span style=\"font-weight: 400;\"> All hydraulics (pump, filter, valves) housed in a single above\u2011ground monobloc chamber beside the pool.<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Leak\u2011Proof Design:<\/b><span style=\"font-weight: 400;\"> Flexible hoses with compression fittings replace buried rigid pipework\u2014no underground connections to rupture.<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Maintenance Access:<\/b><span style=\"font-weight: 400;\"> Quick\u2011release lids allow tool\u2011free filter cartridge access; backwashing is internal and water\u2011efficient.<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Technical Advantages:<\/b><b>\n<p><\/b><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"2\"><i><span style=\"font-weight: 400;\">Hydraulic Efficiency:<\/span><\/i><span style=\"font-weight: 400;\"> Short, smooth internal ducts reduce head loss by up to 30%, lowering pump workload.<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"2\"><i><span style=\"font-weight: 400;\">Simplified Controls:<\/span><\/i><span style=\"font-weight: 400;\"> Centralized multiport valve lets you switch between filter, backwash, rinse, and recirculate without extra plumbing.<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">\ud83d\udd27 <\/span><b>Pro Tip:<\/b><span style=\"font-weight: 400;\"> Ask your contractor to demonstrate the monobloc operation and show you a leak\u2011test (pressure test at 1.5\u00d7 pump head) before purchase.<\/span><\/p>\n<p>&nbsp;<\/p>\n<h2><b>2. Compare Timelines: Faster Installs Reduce Disruption<\/b><\/h2>\n<h3><b>Typical Construction Phases &amp; Durations<\/b><\/h3>\n<table>\n<tbody>\n<tr>\n<td><b>Phase<\/b><\/td>\n<td><b>Traditional Contractor<\/b><\/td>\n<td><b>Desjoyaux Ghana<\/b><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Site survey &amp; approvals<\/span><\/td>\n<td><span style=\"font-weight: 400;\">2\u20134 weeks<\/span><\/td>\n<td><span style=\"font-weight: 400;\">1\u20132 weeks<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Excavation &amp; groundworks<\/span><\/td>\n<td><span style=\"font-weight: 400;\">1\u20132 weeks<\/span><\/td>\n<td><span style=\"font-weight: 400;\">1 week<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Shell construction (concrete)<\/span><\/td>\n<td><span style=\"font-weight: 400;\">3\u20134 weeks + curing<\/span><\/td>\n<td><span style=\"font-weight: 400;\">1\u20132 weeks (prefab panels)<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Filtration &amp; plumbing<\/span><\/td>\n<td><span style=\"font-weight: 400;\">1\u20132 weeks<\/span><\/td>\n<td><span style=\"font-weight: 400;\">2\u20133 days (monobloc)<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Finishes &amp; decking<\/span><\/td>\n<td><span style=\"font-weight: 400;\">2\u20133 weeks<\/span><\/td>\n<td><span style=\"font-weight: 400;\">1\u20132 weeks<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Total<\/b><\/td>\n<td><b>9\u201315 weeks<\/b><\/td>\n<td><b>4\u20136 weeks<\/b><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><b>Why It Matters in Accra:<\/b><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Weather Windows:<\/b><span style=\"font-weight: 400;\"> Rainy season (May\u2013July, Sep\u2013Oct) can halt open excavation. A shorter build reduces spoilage risk.<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Site Access &amp; Traffic:<\/b><span style=\"font-weight: 400;\"> Busy areas (Airport Residential, East Legon) face logistics delays\u2014shorter timelines minimize disruption to neighbors.<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Cost of Delays:<\/b><span style=\"font-weight: 400;\"> Every week saved is less in site overhead (security, fencing, temporary drainage pumps).<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">\ud83d\udd27 <\/span><b>Pro Tip:<\/b><span style=\"font-weight: 400;\"> Request a <\/span><b>Gantt chart<\/b><span style=\"font-weight: 400;\"> or project schedule with milestone dates before signing a contract.<\/span><\/p>\n<h2><b>3. Calculate Lifetime Cost: Include Energy, Maintenance, and Repairs<\/b><\/h2>\n<h3><b>Components of Long\u2011Term Expense<\/b><\/h3>\n<table>\n<tbody>\n<tr>\n<td><b>Expense Category<\/b><\/td>\n<td><b>Traditional Pool<\/b><\/td>\n<td><b>Desjoyaux Pipeless Pool<\/b><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Electricity (pump + lights)<\/span><\/td>\n<td><span style=\"font-weight: 400;\">1,200\u20131,800\u202fGHS\/month<\/span><\/td>\n<td><span style=\"font-weight: 400;\">800\u20131,200\u202fGHS\/month (energy\u2011saver pump)<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Water consumption<\/span><\/td>\n<td><span style=\"font-weight: 400;\">High (backwash losses)<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Low (internal backwash recirculates water)<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Chemical usage<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Moderate<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Moderate<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Maintenance labor<\/span><\/td>\n<td><span style=\"font-weight: 400;\">1\u20132 visits\/week<\/span><\/td>\n<td><span style=\"font-weight: 400;\">1 visit\/week or DIY<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Leak repairs<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Risk of hidden leaks (\u00b1\u202f500\u20132,000\u202fGHS\/repair)<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Negligible (monobloc leaks visible)<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Resurfacing interval<\/span><\/td>\n<td><span style=\"font-weight: 400;\">8\u201310 years (plaster)<\/span><\/td>\n<td><span style=\"font-weight: 400;\">10\u201312 years (with proper care)<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>5\u2011Year Total<\/b><\/td>\n<td><b>~\u202f150,000\u202fGHS<\/b><\/td>\n<td><b>~\u202f120,000\u202fGHS<\/b><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><b>Key Takeaways:<\/b><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Energy Savings:<\/b><span style=\"font-weight: 400;\"> Desjoyaux\u2019s high\u2011efficiency pump and reduced head loss lower power draw by up to 35%.<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Water Conservation:<\/b><span style=\"font-weight: 400;\"> Internal backwash recycles up to 80% of filter\u2011cleaning water\u2014crucial during dry spells.<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Repair Risk:<\/b><span style=\"font-weight: 400;\"> Monobloc design surfaces any seal or hose issue immediately, preventing costly underground excavation.<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">\ud83d\udd27 <\/span><b>Pro Tip:<\/b><span style=\"font-weight: 400;\"> Ask for an <\/span><b>Energy &amp; Water Consumption Estimate<\/b><span style=\"font-weight: 400;\"> based on your pool\u2019s volume and local utility rates.<\/span><\/p>\n<h2><b>4. Verify Warranties: Look for at Least a 10\u2011Year Structural Guarantee<\/b><\/h2>\n<h3><b>What to Watch For<\/b><\/h3>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Shell Integrity:<\/b><span style=\"font-weight: 400;\"> A structural warranty should cover leaks, cracking, and foundational movement for a minimum of 10\u202fyears.<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Equipment Coverage:<\/b><span style=\"font-weight: 400;\"> Pumps, filters, and automation devices should have 2\u20135\u202fyear manufacturer warranties.<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Exclusions &amp; Conditions:<\/b><b>\n<p><\/b><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"2\"><i><span style=\"font-weight: 400;\">Proper Maintenance Requirement:<\/span><\/i><span style=\"font-weight: 400;\"> Warranties often voided if maintenance guidelines (e.g., chemical balance, cleaning frequency) aren\u2019t met.<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"2\"><i><span style=\"font-weight: 400;\">Approved Chemicals:<\/span><\/i><span style=\"font-weight: 400;\"> Use only manufacturer\u2011specified sanitizers and pH adjusters (e.g., Desjoyaux\u2011branded chemicals).<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"2\"><i><span style=\"font-weight: 400;\">Installation Standards:<\/span><\/i><span style=\"font-weight: 400;\"> Warranties apply only if installed by certified technicians.<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><b>Desjoyaux Ghana Guarantees:<\/b><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>10\u202fYears on Shell<\/b><span style=\"font-weight: 400;\"> against structural defects and leaks.<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>5\u202fYears on Monobloc Unit<\/b><span style=\"font-weight: 400;\"> and high\u2011efficiency pump.<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>1\u202fYear on All Accessories<\/b><span style=\"font-weight: 400;\">, including covers and lighting.<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">\ud83d\udd27 <\/span><b>Pro Tip:<\/b><span style=\"font-weight: 400;\"> Request a <\/span><b>copy of the signed warranty certificate<\/b><span style=\"font-weight: 400;\"> and clarify the claims process before handover.<\/span><\/p>\n<h2><b>5. Review Portfolios: Visit Live Sites or View Recent Projects<\/b><\/h2>\n<h3><b>Portfolio Deep Dive<\/b><\/h3>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>On\u2011Site Visits:<\/b><span style=\"font-weight: 400;\"> Nothing beats seeing a fully operational pool in person. Note the quality of finishes, water clarity, and integration with landscaping.<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Video Walkthroughs:<\/b><span style=\"font-weight: 400;\"> For contractors like Desjoyaux Ghana, ask for drone footage or time\u2011lapse videos showing the build sequence\u2014from excavation to commissioning.<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Client References:<\/b><span style=\"font-weight: 400;\"> Talk to homeowners or facility managers about responsiveness, service quality, and any post\u2011install issues.<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Case Studies:<\/b><span style=\"font-weight: 400;\"> Look for documented projects in neighborhoods you know: Airport Area estates, hotel pools in Labadi, or corporate wellness facilities in East Legon.<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<\/ul>\n<p><b>Desjoyaux Ghana Showcase:<\/b><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>East Airport Estates Clubhouse Pool:<\/b><span style=\"font-weight: 400;\"> 50\u202fkL capacity, pipeless system, online pump controls.<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Accra Marriott Hotel:<\/b><span style=\"font-weight: 400;\"> Free\u2011form pool with LED mood lighting and automated chemical dosing.<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Regimanuel Satellite City Model Pool:<\/b><span style=\"font-weight: 400;\"> Rapid 18\u2011day install, integrated with 24\/7 RGEMC maintenance.<\/span><span style=\"font-weight: 400;\">\n<p><\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">\ud83d\udd27 <\/span><b>Pro Tip:<\/b><span style=\"font-weight: 400;\"> Compare a contractor\u2019s <\/span><b>\u201cas\u2011built\u201d<\/b><span style=\"font-weight: 400;\"> portfolio (completed pools older than 2\u20133 years) to assess long\u2011term performance, not just brand\u2011new showpieces.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Selecting the right pool contractor in Accra means balancing technical performance, construction speed, lifetime operating cost, warranty protection, and proven track record. <\/span><b>Desjoyaux Ghana Ltd<\/b><span style=\"font-weight: 400;\"> excels in every category, thanks to its patented pipeless system, expedited 4\u20136\u2011week builds, energy\u2011efficient operation, rock\u2011solid warranty, and transparent portfolio.<\/span><\/p>\n<p>&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<\/p>\n<p><span class=\"OYPEnA font-feature-liga-off font-feature-clig-off font-feature-calt-off text-decoration-none text-strikethrough-none\"><a href=\"https:\/\/regimanuelgray.com\/houses-for-sale-in-accra-the-pearls\/\">Regimanuel Gray (RGL)<\/a> is an established real estate developer in Ghana and a member of the RG Group. RG Group has subsidiaries including <\/span><span class=\"OYPEnA font-feature-liga-off font-feature-clig-off font-feature-calt-off text-decoration-none text-strikethrough-none\">Regimauel Concrete Produc<\/span><span class=\"OYPEnA font-feature-liga-off font-feature-clig-off font-feature-calt-off text-decoration-none text-strikethrough-none\">ts <\/span><span class=\"OYPEnA font-feature-liga-off font-feature-clig-off font-feature-calt-off text-decoration-none text-strikethrough-none\">Ltd<\/span><span class=\"OYPEnA font-feature-liga-off font-feature-clig-off font-feature-calt-off text-decoration-none text-strikethrough-none\"> (RCP), <\/span><span class=\"OYPEnA font-feature-liga-off font-feature-clig-off font-feature-calt-off text-decoration-none text-strikethrough-none\">Bessblock<\/span> <span class=\"OYPEnA font-feature-liga-off font-feature-clig-off font-feature-calt-off text-decoration-none text-strikethrough-none\">Concrete Products<\/span> <span class=\"OYPEnA font-feature-liga-off font-feature-clig-off font-feature-calt-off text-decoration-none text-strikethrough-none\">Ltd <\/span><span class=\"OYPEnA font-feature-liga-off font-feature-clig-off font-feature-calt-off text-decoration-none text-strikethrough-none\">(BCPL),<\/span> <span class=\"OYPEnA font-feature-liga-off font-feature-clig-off font-feature-calt-off text-decoration-none text-strikethrough-none\">Sierrablock Concrete Products Ltd (SCPL)<\/span><span class=\"OYPEnA font-feature-liga-off font-feature-clig-off font-feature-calt-off text-decoration-none text-strikethrough-none\"> and <\/span><a href=\"https:\/\/desjoyauxgh.com\/index.php\/2025\/08\/07\/top-10-swimming-pool-construction-companies-in-ghana\/\"><span class=\"OYPEnA font-feature-liga-off font-feature-clig-off font-feature-calt-off text-decoration-none text-strikethrough-none\">Desjoyaux<\/span> <span class=\"OYPEnA font-feature-liga-off font-feature-clig-off font-feature-calt-off text-decoration-none text-strikethrough-none\">Ghana Ltd <\/span><\/a><span class=\"OYPEnA font-feature-liga-off font-feature-clig-off font-feature-calt-off text-decoration-none text-strikethrough-none\">(DGL) a swimming pool construction company.\u00a0<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>How to Choose Your Swimming Pool Contractor in Accra, Ghana: A Detailed Technical Guide Installing&hellip;<\/p>\n","protected":false},"author":990066,"featured_media":1574,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"spay_email":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-1831","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"aioseo_notices":[],"jetpack_featured_media_url":"https:\/\/desjoyauxgh.com\/wp-content\/uploads\/2022\/04\/DSC_0365.jpg","_links":{"self":[{"href":"https:\/\/desjoyauxgh.com\/index.php\/wp-json\/wp\/v2\/posts\/1831","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/desjoyauxgh.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/desjoyauxgh.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/desjoyauxgh.com\/index.php\/wp-json\/wp\/v2\/users\/990066"}],"replies":[{"embeddable":true,"href":"https:\/\/desjoyauxgh.com\/index.php\/wp-json\/wp\/v2\/comments?post=1831"}],"version-history":[{"count":1,"href":"https:\/\/desjoyauxgh.com\/index.php\/wp-json\/wp\/v2\/posts\/1831\/revisions"}],"predecessor-version":[{"id":1832,"href":"https:\/\/desjoyauxgh.com\/index.php\/wp-json\/wp\/v2\/posts\/1831\/revisions\/1832"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/desjoyauxgh.com\/index.php\/wp-json\/wp\/v2\/media\/1574"}],"wp:attachment":[{"href":"https:\/\/desjoyauxgh.com\/index.php\/wp-json\/wp\/v2\/media?parent=1831"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/desjoyauxgh.com\/index.php\/wp-json\/wp\/v2\/categories?post=1831"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/desjoyauxgh.com\/index.php\/wp-json\/wp\/v2\/tags?post=1831"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}