POOL CONSTRUCTION
- +How long does it take to have a Desjoyaux Swimming Pool built?
- Eight (8) weeks approximately
- +What are the steps for swimming pool construction?
- Site inspection and client specification outline
- Quotation generation and contract agreement
- Setting of foundation (including excavation and form work)
- Casting of concrete and screeding
- Paving and tiling of paving around the pool
- Installation of Liner and Filtration System
- Clearing and handing over the site
- +What is a Liner?
- Reinforced PVC sheet (2mm in thickness) that guarantees water tightness of the pool which is welded together. This comes in different colours:
-
- Dark Blue
- Sea Blue
- Beige
- Grey
- Mosaic
-
- +What is the Desjoyaux Filtration System?
- The Desjoyaux filtration is a compact filter system that is saddled on the side wall of the pool (preferably on the deep end). It consists of a front end that is submerged into the pool and contains all the filter elements (filter chamber) and a rear end that is inserted in the edge of the pool and serves as a technical room with the pump and delivery/suction line. Thanks to this concept, pipelines are avoided and the risk of leakage is minimized.
- +What shapes/sizes of swimming pools do you construct?
- Our swimming pools can take any shape or size depending on the client’s request and the area available for construction.
- +How do I request for a site inspection?
- You may visit our office on the Spintex Road to fill out a site inspection form. Alternatively, you can contact us on 0202601650 or send us an email at info@desjoyauxgh.com to book your site inspection.
CLEANING AND MAINTENANCE
- +How do I request for my pool to be cleaned?
- You can contact us on 0202601650 or send us an email at info@desjoyauxgh.com with your pool cleaning request.
- +How high should the water level in my swimming pool be?
- The ideal water level should be ¾ the height of the skimmer and must be regularly checked.
- +How do I drain the water in my Desjoyaux swimming pool?
- This can be done using a submersible pump
- +What are the ideal Chlorine and Ph levels?
- The ideal chlorine level is between 1.0 and 3.0 parts per million (ppm) and pH should be between 7.2 and 7.8
- +What should I do when my water turns green?
- There could be many contributing factors, however, the growth of algae is usually the culprit as it makes the water turn green. This may be treated by applying Algaecide, chlorine, flocculants and pH.
- +What types of Chlorine do you have?
- We have the Chlorine Tablets and Chlorine Granules which are in 90% concentrates
OPERATIONS
- +Where is your office located?
- Desjoyaux Ghana LTD is located on the Spintex road (opposite Noble House and adjacent to Max Mart)
- +What are the working hours for Desjoyaux Ghana?
- We are open from Monday to Friday (8am to 5pm) and on Saturdays (8am to 2pm)
- +How long ago has the company been in operation in Ghana?
- Desjoyaux Ghana Limited was established in 2004 and has been a major player in the swimming pool industry in Ghana.
- +What services do you provide?
- Desjoyaux Ghana Limited deals in:
- Construction of Swimming Pools
- Renovation and Finishing of Swimming Pools
- Cleaning and Maintenance of Pools
- Sales of Chemicals and Accessories